RG-PK
Power Connection Kit
- Use With: SRF-RG,TW-Wrap and TW-Melt
- Third-party certifications: UL Listed, CSA, FM
Power termination into junction box with one end seal and two “Warning-Electric Traced” labels.
Note: To minimize the danger of fire if the heating cable is damaged or improperly installed, use a Ground-Fault-Protection Device (GFPD), sold separately.